Wadi Hilty Road is a branch from Sohar-Wadi Hibi Road to the right-hand side 32 km away from Sohar roundabout passing through many villeges,. The scope of works include but not limited to the design & construction of 23 km all-weather road with 3 bridges.
The project length is 30 km starting from the existing asphalt road of Al Murry and end at the existing âTâ Junction to Al Qumayra Village. It comprises the construction of single carriageway including flood ways,wadi bridges, and numerous box culverts.
This is KAS's first project with PDO which includes the rehabilation of the road in Ras Al Hamra close to the PDO headquarters and refinery in Mina Al Fahal. Construction of a dual carriageway and replacement of existing single carriageway and major utilities such as drainage,electrical,telephone lines and gas pipelines.
Phase 5.1 of the Oman Convention and Exhibition Center is being executed by KAS as a JV with a local company. The scope of KAS is the construction of a road and other structural works in the area. This includes 6 km of roads with a 100 m bridge and various utilities.
Dualization of Bidbid â Sur Road Part 2 of Section || from Al Kamil to Sur with a total length of 52 km. Upgrading of the road to a three-lane dual carriageway with a major by-pass north of Al kamil and road realignment in the mountainous section between the Al Kamil and Sur Hospital.